
金地国际花园二期土石方工程在
与土建单位静压桩交叉作业中
Gold ground two period ground square engineerings in the international garden at Set up unit static pressure a stake with soil to cross homework in Make awards a rites
基坑开挖过程中
The ground square opens to dig medium
Gold ground two period ground square engineerings in the international garden
 
项目经理指挥土方外运
The item manager directs soil a square outside a luck
|